Factory Acceptance Test (FAT)

Factory Acceptance Test (FAT)

Testing the traffic signal controller before it is installed on site is a must to ensure that it has been set up correctly and that all the information contained in the controller specification has been accurately replicated in the controller.

This Factory Acceptance Test (FAT) is undertaken either on a computer simulation of the junction (called an emulator) where all aspects of the controller can be tested and adjusted, or alternatively in the signal company depot using a rig of lights set up to represent the junction being tested.

The Factory Acceptance Test is a crucial part of the design process where any issues and problems must be identified and resolved before the controller is installed on street.

Require Traffic Signal Design Services?

Sanderson Associates have enjoyed over 37 years in business, our Traffic Signal Design Team have extensive experience in assisting our Clients with their Traffic Signal Design requirements for a wide variety of major and minor developments throughout the whole of the UK, Isle of Man and Ireland.

We would be pleased to provide you with our competitive fee proposal for our Traffic Signal Design Services, please call us on 01924 844080 or click here to complete our secure online form.

Factory Acceptance Test, FAT, Traffic Signal Controller
Tested, Simulation, Emulator
Traffic Signal Design Services
Cookie Settings